1. Introduction 1.1. Project/Component Working Name: GNU coreutils 8.5 1.2. Name of Document Author/Supplier: Author: John.Sonnenschein@Sun.COM 1.3 Date of This Document: 13th May, 2010 4. Technical Description Update GNU coreutils to 8.5 1. Summary This fasttrack is a direct follow-on to: PSARC/2007/048 Include GNU coreutils 6.7 and PSARC/2009/355 GNU coreutils 7.4 It increments the version of GNU coreutils in OpenSolaris to 8.5. Patch release binding is requested. 2. Discussion GNU coreutils--the combination of GNU fileutils, GNU shellutils, and GUN textutils--provide implementations of many common Unix utilities as well as various enhancements and additional related utilities. The version proposed here is the latest stable version available and will replace version 7.4, which is currently in OpenSolaris. 3. Interfaces PSARC/2009/355 section 3 describe the interface details for the GNU coreutils 7.4 commands. The changes between 7.4 and 8.5 are described in the Coreutils.8.5.txt file in the case materials directory. Each command retains the same stability level. Between 7.4 and 8.5, the following new command was introduced: /usr/bin/ nproc stdbuf Location Uncommitted Invocation Uncommitted Human-readable output Not an Interface See the various man pages in the case materials directory for more details. 4. Reference Documents (located in case materials directory) Coreutils.8.5.changes.txt - (from project NEWS file). .1.txt manual pages for the following commands: base64 basename cat chcon chgrp chmod chown chroot cksum comm cp csplit cut date dd df dir dircolors dirname du echo env expand expr factor false fmt fold groups head hostid id install join kill link ln logname ls md5sum mkdir mkfifo mknod mktemp mv nice nl nproc nohup od paste pathchk pinky pr printenv printf ptx pwd readlink rm rmdir runcon seq sha1sum sha224sum sha256sum sha384sum sha512sum shred shuf sleep sort split stat stdbuf stty sum sync tac tail tee test timeout touch tr true truncate tsort tty uname unexpand uniq unlink uptime users vdir wc who whoami yes 6. Resources and Schedule 6.4. Steering Committee requested information 6.4.1. Consolidation C-team Name: SFW 6.5. ARC review type: FastTrack 6.6. ARC Exposure: open 7. Prototype Availability: 7.1. Prototype Availability: June 2009. 7.2. Prototype Cost: 2 weeks.